fbpx

CREATING THE SYSTEM OF DRINKING WATER

About This Project

Currently, the project is in its final stages of realization.

 

It has been realized in 4 stages:

  1. Improve water collection well (Already done)
  2. Change the lines and pipes through which the water flows into the second well storage, total 1 kilometer and a half (Already done)
  3. Improve infrastructure and install a drip purification system (Already done)
  4. Change the laying of pipe from the second storage well to the houses of the beneficiaries

 

 

BACK TO PROJECTS

Share
Category
proyectos